Bauherr

Trianel Windkraftwerk Borkum II GmbH & Co. KG

Kunde

Seaway Heavy Lifting (SHL)

Planungsperiode

2017 - 2018

Winturbinen

32 x 6.2 MW; 200MW rated power

Tragstruktur

Monopile + Transition Piece

Erbrachte Leistung          

  • Basic and Detailed Design of Substructure (MP + TP)
    (incl. building permit design, design of grouted and flanged connection, design of secondary steel elements:
    boatlanding, resting platform, J-Tube, cable platform, external working platform and inner platforms, preparation
    of specifications e.g. coating spec.; material selection spec.; fabrication spec., weight control report, collision
    friendliness analysis, reassessment of piles after pile driving due to pile fatigue damage)
  • FEED Design including Conceptual Design (1st BSH release)
    (incl. primary and secondary steel elements)

Bauherr

wpd AG

Kunde

Ambau GmbH

Planungsperiode

2015 – 2016

Winturbinen

18 x 6.2 MW; 108 MW rated power

Tragstruktur

Monopile + Transition Piece, OSS Monopile

Erbrachte Leistung          

  • Basic and Detailed Design of Substructure (MP + TP)
    (incl. building permit design, design of flanged connection, design of secondary steel elements: boatlanding,
    resting platform, J-Tube, cable platform, external working platform and inner platforms, preparation of specifications
    e.g. coating spec.; material selection spec.; fabrication spec., weight control report, collision friendliness analysis,
    ice loading, reassessment of piles after pile driving due to pile fatigue damage)
  • FEED Design including Conceptual Design
    (incl. primary and secondary steel elements, flanged and grouted connection)

Bauherr

innogy SE

Kunde

Ambau GmbH / RWE

Planungsperiode

2014 – 2015

Winturbinen

54 x 6.2 MW; 324 MW rated power

Tragstruktur

Monopile + Transition Piece

Erbrachte Leistung          

  • Basic and Detailed Design of Substructure (MP + TP)
    (incl. building permit design, design of flanged connection, design of secondary steel elements: boatlanding,
    resting platform, J-Tube, cable platform, external working platform and inner platforms, preparation of specifications
    e.g. coating spec.; material selection spec.; fabrication spec., weight control report, collision friendliness analysis,
    ice loading, reassessment of piles after pile driving due to pile fatigue damage)
  • FEED Design including Conceptual Design
    (incl. primary and secondary steel elements, flanged and grouted connection)

Bauherr

YunNeng Wind Power CO., LTd. (wpd)

Kunde

YunNeng Wind Power CO., LTd. (wpd)

Planungsperiode

2019

Winturbinen

80 x 8 MW; 640 MW rated power

Tragstruktur

Monopile + Transition Piece

Erbrachte Leistung          

  • Basic and Detailed Design of Substructure (MP + TP)
    (incl. building permit design, design of grouted and flanged connection, design of secondary steel
    elements: boatlanding, resting platform, J-Tube, cable platform, external working platform and inner
    platforms, preparation of specifications e.g. coating spec.; material selection spec.;
    fabrication spec., weight control report, collision friendliness analysis, reassessment of piles after pile driving due
    to pile fatigue damage, earthquake analysis, liquefaction)
  • FEED Design including Conceptual Design
    (incl. primary and secondary steel elements)

Bauherr

E.ON / Equinor

Kunde

STX Solutions (France)

Planungsperiode

2016

Offshore Substation

385 MW rated power

Tragstruktur

Jacket

Erbrachte Leistung          

  • Basic and Detailed Design of Jacket and Piles
    (incl. building permit design, design of grouted connection, design for Sea Ice loads, secondary
    steel design of Boatlanding, Resting Platform, J-Tube, Cable Platform, consideration of heated
    Boatlanding, preparation of design reports and drawings, preparation of specifications e.g. coating spec.;
    material selection spec.; fabrication spec, ice loads, detailed load case combination table, collision
    friendliness analysis for ferry, oil tanker and container ship, reassessment of piles after pile driving due to pile
    fatigue damage, reassessment of axial pile capacity
  • FEED Design including Conceptual Design
    (incl. primary and secondary steel elements)

Project

Year

Country

Structure

CONFIDENTIAL

2021

UK

WTG MONOPILE

He Dreiht

2021

GER

WTG MONOPILE

He Dreiht (Concept)

2020

GER

WTG MONOPILE

FEW Baltic II

2020

PL

WTG OSS MONOPILE / JACKET

CONFIDENTIAL

2020

US

WTG MONOPILE

CONFIDENTIAL

2020

UK

WTG MONOPILE

Guanyin

2020

TWN

WTG MONOPILE

Baltic Eagle

2019

GER

WTG MONOPILE

Download Link gesamte Liste:
2021-02 Project Reference List.pdf